Last updated: November 3, 2026
A custom lithium battery pack project rarely fails at the factory. It fails at the RFQ stage, when a buyer sends a two-line request like “we need a 48V 20Ah battery for our scooter, please quote” and gets back five prices that range from $180 to $640. Nobody can compare those quotes, because none of them describe the same product.
This guide is written from the supplier side. After quoting hundreds of custom pack projects, we can tell you exactly which twelve items in a request change the price, which ones engineers need before they can even start a design, and how to read a quote that looks suspiciously cheap. If you are preparing a Request for Quotation for a custom lithium battery pack, this is the checklist we wish every buyer used.
Why a Weak RFQ Costs You Money
There are three direct costs of an incomplete RFQ.
First, the price spread is fake. When a buyer writes “48V 20Ah”, suppliers will silently fill the gaps in different ways. One quotes a 13S LiFePO4 pack with a 30A BMS in an ABS case. Another quotes a 13S NCM pack with a 60A BMS in an aluminium case with IP67 sealing. Both say “48V 20Ah”. The price difference is 2.5 times, and it has nothing to do with the supplier being expensive or cheap.
Second, engineering time is wasted on assumptions. A pack design starts with the mechanical envelope and the load profile. Without them, a supplier either guesses (and you pay for a wrong sample) or sends back a questionnaire (and you lose one to two weeks in the middle of your development schedule).
Third, you lose the ability to compare. Procurement teams usually compare unit price. For custom packs, unit price is only one of four numbers that matter — the others being tooling cost, minimum order quantity, and the cost of certification. A quote at $180 with $4,000 tooling and 500pcs MOQ is not cheaper than a quote at $260 with no tooling and 100pcs MOQ.
The 12 Specifications That Decide Your Quote
1. Application and Duty Cycle
Start with what the pack actually does. “E-bike” is not enough — a cargo e-bike doing 8 hours a day in a delivery fleet and a leisure e-bike used twice a week are two different products. Tell the supplier:
- What the end product is, and who uses it
- Typical daily runtime and charge cycles per day
- Expected service life (2 years / 5 years / 8 years)
- Whether the pack is user-removable or fixed inside the product
This single paragraph often changes cell grade selection, BMS accuracy requirements, and whether the pack needs active thermal management.
2. Voltage and Capacity
Give the nominal voltage, the full operating range, and the capacity — and be explicit about whether the capacity is measured at the pack level or the cell level.
- Nominal voltage — e.g. 48V (13S NCM) or 51.2V (16S LiFePO4)
- Operating range — e.g. 39V to 54.6V, and what your device can tolerate at the low end
- Rated capacity — in Ah, stated at a specific discharge rate (0.5C is standard)
- Usable capacity — how much you need before your device cuts off
A common trap: a buyer specifies 20Ah but the device draws 40A continuously. At 2C discharge, the delivered capacity drops to roughly 18Ah, and the buyer blames the supplier for “short capacity”. State the load first, then the capacity.
3. Cell Type and Grade
Cell choice drives 50 to 70 percent of the pack cost. Be specific about what you will accept.
| Cell format | Dimensions | Typical capacity | Best for |
|---|---|---|---|
| 18650 | 18mm × 65mm | 2.0–3.5Ah | Compact packs, mature and cheapest |
| 21700 | 21mm × 70mm | 4.0–5.0Ah | E-bikes, energy density priority |
| 32700 | 32mm × 70mm | 6.0–6.5Ah | High capacity, fewer connections |
| Prismatic / pouch | Custom | 20–300Ah | Thin form factors, high integration |
Also state the chemistry (NCM, LFP, NCA, LTO), the grade (A-grade only, or grade A with matched internal resistance), and whether a specific brand is required. If you accept any brand, say so — it can cut cost by 15 to 25 percent. If you require a specific brand, say which, because availability changes quarterly.
4. Continuous and Peak Discharge Current
Two numbers, both mandatory: continuous current and peak current with duration.
- Continuous: e.g. 30A for 30 minutes without the case exceeding 55°C
- Peak: e.g. 60A for 10 seconds, motor startup
These numbers decide the BMS rating, the nickel strip thickness, the busbar design, and whether the pack needs forced air cooling. A supplier who is not given these will assume 0.5C continuous, which is often too low for traction applications and too high for standby applications.
5. BMS Requirements
The BMS is where most hidden cost lives. Specify:
- Protection thresholds — over-charge, over-discharge, over-current, short circuit, over-temperature, low-temperature charge cut-off
- Balancing — passive or active, and balancing current
- Communication — none, UART, RS485, CAN (and which protocol: Modbus, CANopen, or a proprietary one)
- SOC accuracy — ±5 percent is common, ±2 percent needs a smarter BMS
- Data logging — does the pack need to store cycle history for warranty disputes?
If your device has a display that shows battery percentage, you need to specify who owns the SOC algorithm — the BMS or your controller. This is a frequent source of integration failure.
6. Mechanical Envelope and Mounting
Send a drawing, not a description. At minimum:
- Maximum length, width, height in millimetres, with tolerance
- Mounting hole positions and thread type
- Which faces are exposed and which are hidden
- Any keep-out zones for cables, controllers, or frame tubes
- Weight limit, if the product is handheld or wearable
If you do not have a drawing yet, send the cavity dimensions of your product plus photos. Suppliers design enclosures every week and can propose a shape, but they need the constraint first.
7. Housing Material and Ingress Protection
State the material (ABS, PC+ABS, aluminium alloy, steel) and the IP rating you actually need. IP54, IP65 and IP67 are three different price points, and IP67 adds potting compound, gaskets, and a pressure test step.
One warning: IP67 on the pack does not make your product waterproof. Cable exits and connector mating faces are usually the leak path. Specify whether the connector is inside the sealed volume or outside it.
8. Connectors and Wiring
Give the connector model or the mating requirement. “Standard connector” means nothing — there are dozens of families (XT60, XT90, Anderson, Molex, Higo, Rosenberger) and they are not interchangeable.
- Discharge connector type and gender
- Charge connector type, if separate
- Wire gauge and length
- Whether a fuse, switch, or main relay is required
- Label and marking requirements
9. Charging Profile
Specify the charger, even if you do not buy it from the same supplier:
- Charge voltage (must match the pack’s full-charge voltage)
- Charge current (0.2C, 0.5C, 1C)
- CC/CV behaviour and cut-off condition
- Whether the charger must be certified together with the pack
A pack quoted without charge parameters is an incomplete quote. If the supplier does not ask, that is a signal about their process.
10. Operating Temperature Range
This is the single most under-specified item, and it is expensive to fix later.
| Chemistry | Discharge range | Charge range |
|---|---|---|
| NCM / NCA | -20°C to 60°C | 0°C to 45°C |
| LiFePO4 (LFP) | -20°C to 60°C | 0°C to 45°C |
| LTO | -30°C to 55°C | -20°C to 45°C |
Charging a lithium pack below 0°C causes lithium plating, which is permanent damage. If your product is used in cold climates, you need either a BMS with low-temperature charge cut-off (cheap) or a heating film inside the pack (adds cost and 10 to 15 percent to the BMS complexity). Decide which one before you ask for a price.
11. Certifications and Documentation
List what you need, and who pays for it. Typical requirements:
- UN38.3 — mandatory for air transport, per pack model
- MSDS — shipping documentation
- IEC 62133-2 — portable lithium cells and batteries
- IEC 62619 — industrial applications
- UL 2054 / UL 2271 — North America, packs and light EV respectively
- CE, RoHS, REACH — EU market access
Certification is per model, not per factory. A new pack shape or a new cell means a new test report. Budget for this early — a UN38.3 report alone typically takes two to three weeks and costs several hundred to over a thousand US dollars depending on the lab.
12. Order Quantity and Ramp Plan
Give three numbers: prototype quantity, first production batch, and expected annual volume. This lets the supplier choose between hand-built samples and tooled production, and it lets them tell you honestly where the price will land at scale.
Also state the delivery destination and Incoterm (FOB, CIF, DDP). A DDP quote to a European warehouse can be 20 percent higher than FOB Shenzhen, and comparing them side by side without knowing the Incoterm is meaningless.
A Ready-to-Use RFQ Template
Copy this into your email or attachment. A supplier can quote from this table alone.
| Item | What to write | Example |
|---|---|---|
| Application | End product, user, duty cycle | Cargo e-bike, 6h/day, 2 cycles/day |
| Nominal voltage | V, plus series count if known | 48V (13S) |
| Operating range | Min to max V | 39V–54.6V |
| Capacity | Ah at stated C-rate | 20Ah @ 0.5C |
| Cell | Format, chemistry, grade, brand policy | 21700, NCM, grade A, brand open |
| Continuous current | A, duration | 30A continuous |
| Peak current | A, seconds | 60A / 10s |
| BMS | Protections, comms, SOC accuracy | CAN, ±5% SOC, low-temp cut-off |
| Dimensions | L×W×H mm, tolerance | 360×95×90mm, ±1mm |
| Housing | Material, IP rating | Aluminium, IP65 |
| Connectors | Type, gender, wire | XT90 discharge, DC jack charge |
| Charger | V, A, CC/CV | 54.6V, 4A, CC/CV |
| Temperature | Discharge and charge range | -10°C to 45°C discharge |
| Certification | List, who pays | UN38.3 + IEC 62133-2, buyer pays |
| Quantity | Sample, batch, annual | 5 / 200 / 3,000 |
| Incoterm | Term and destination | FOB Shenzhen |
How to Read the Quotes You Get Back
Once you have three quotes, do not sort them by unit price. Compare these five lines instead.
Cell specification. If a quote does not name the cell brand and grade, treat the price as a placeholder. The difference between grade A and grade B cells in the same format can be 30 percent, and the cycle life difference is 800 versus 300 cycles.
BMS model. A generic “smart BMS” quote and a named BMS with CAN protocol are not the same product. Ask for the model number.
Tooling and NRE. Some suppliers hide enclosure tooling in the unit price for the first batch. Ask separately: is there a one-time tooling fee, and who owns the mould afterwards?
MOQ and price breaks. Ask for a price at 100, 500 and 2,000 pieces. A flat price across all three quantities usually means the supplier has not costed the tooling properly, and the price will change after the first order.
What is excluded. Charger, packaging, certification, and freight are the four usual exclusions. A low unit price with all four excluded is often more expensive than a higher price with them included.
Five Mistakes That Delay Every Project
- Sending a spec sheet without a drawing. Mechanical fit is the number one reason a first sample fails. Send a PDF drawing or at least a dimensioned sketch.
- Quoting before the load profile is known. If the continuous current is unknown, the BMS and busbar cannot be sized, and the price is a guess.
- Treating capacity as a single number. Capacity at 0.2C and capacity at 2C differ by 10 to 15 percent. State the C-rate.
- Forgetting the certification cost. UN38.3 and IEC 62133-2 are per model. A new enclosure shape can force a new test.
- Changing the design after the sample. Every change after the first sample resets tooling and often the certification. Freeze the specification before the sample PO.
What Timeline to Expect
For a mid-complexity pack (custom enclosure, CAN BMS, 500 to 1,000 units), a realistic schedule looks like this:
| Stage | Duration |
|---|---|
| RFQ review and technical clarification | 3–5 working days |
| Design proposal and quote | 5–7 working days |
| Sample build and internal test | 15–20 working days |
| Sample shipping and your validation | 7–15 days |
| Certification (if required) | 2–4 weeks, parallel with production prep |
| Mass production | 25–35 working days after PO and material lead time |
Total from RFQ to first production batch is typically 3 to 4 months. If a supplier promises 6 weeks including certification, ask which lab and which report number they are reusing.
Next Step
If you already have a specification table, send it to us and we will tell you within three working days whether it is buildable as written, what is missing, and what the pack will cost at your volume. If you only have a product idea and a cavity dimension, that is enough to start — we design enclosures and BMS configurations for custom packs from 3.6V to 72V, using 18650, 21700, 32700 and prismatic cells.
Request a custom battery pack quote — include your application, voltage, capacity and target quantity, and our engineering team will reply with a specification review rather than a bare price.